Free Consultation
info@elitasrcs.com | ➀ +91-9076611766 ➁ +91-9076611767
Scheme-I Certification

BIS (ISI) Certification
for Steel & Steel Products

Get the BIS ISI Mark for structural steel, plates, pipes, and TMT bars as per Ministry of Steel QCOs, with end-to-end support from ERCS.

What's Included?
Steel QCO Check
IS Compliance Review
Mill Inspection Support
Licence Management
1500+
Projects Done
700+
Global Clients
100%
Guarantee

Request a Consultation

Connect with our regulatory experts today.

Home Services BIS CRS Registration

Overview of BIS Certification for Steel Products

The Ministry of Steel is one of the Indian government departments responsible for ensuring that all steel and steel products comply with regulations.

It has issued the Steel Quality Control Order, outlining the requirements for regulatory compliance for steel and products for BIS Certification. All the manufacturers and importers must comply with the IS specification to obtain approval marks, like the ISI mark, from the Bureau of Indian Standards, the nation's official standards organization. The Ministry of Consumer Affairs, Food, and Public Distribution currently oversees BIS, which was once India's biggest third-party inspection organization. BIS launched a variety of schemes for approving different product categories.

BIS is the national standards organization under the Bureau of Indian Standards Act. BIS Certification (ISI) is obtained by the manufacturers in the name of the product when it is certified by BIS to meet all the essential standards for dependability, safety, and quality. BIS approval is required in India for structural steel, steel plates, steel pipes, and reinforcing steel bars, also known as TMT bars, that are used for reinforcing concrete structures, providing strength, flexibility, and durability in construction.

Types of BIS Certificate for Steel

Below are the different certification schemes for both the Indian manufacturers and foreign manufacturers:

1. Scheme for Indian Manufacturers

The purpose of the BIS Certification Scheme for Indian manufacturers is to guarantee that the goods meet the necessary standards for performance, quality, and safety in India. As proof of conformity with Indian standards, this certificate is crucial for local producers in order to gain access to government contracts, exports, and customer trust.

2. Foreign Manufacturers Scheme (FMCS)

The Bureau of Indian Standards (BIS) has a Foreign Manufacturers Certification Scheme under FMCD for foreign manufacturers who want to sell products in India or export them to the Indian market. The scheme makes sure that products from foreign countries meet Indian Standards (IS) with respect to quality, safety, and even performance requirements.

BIS Certification for Steel Imports

To ensure that steel imported into India meets Indian Standards when it enters the market, BIS standards for steel products need to be followed to check whether the goods comply with the provided regulations or not. To prevent the introduction of below-average items into the market that can be dangerous for customers, it only tests the standards, safety, and other suitability of steel for other factories and constructions. To ensure seamless trade operations and comply with regulatory requirements, importers must get BIS certification for specific steel products.

Eligibility Criteria for Steel Products in India

These are some of the basic requirements for getting your steel products BIS certified. Please take note of the following parameters:

Identify Standard

Before applying, the applicant must locate the relevant Indian standard (IS).

Chemical & Mechanical

Chemical and Mechanical (Grades) of the material should be covered in the standard.

Production Unit Only

Only the production unit (where a finished product is made) receives the ISI Certificate. Not importers or distributors.

Multiple Locations

Applicants must submit a separate application for each factory address if they have several factories.

Process Chart

The production process chart, from raw material receipt to final packing, must be displayed.

Testing Infrastructure

Must have all necessary testing equipment and qualified quality control personnel (QCI) per the SIT.

Mandatory Product List for BIS (ISI) Certification for Steel

Below is a comprehensive list of steel products that require mandatory compliance in India:

S.No. Product Name & IS Standard
1General-Purpose Chairs and Stools IS 17632
2Wear Abrasion Resistant Steel and Plates IS 18809
3Carbon and Low Alloy Steel Billets, Blooms, Slabs and Bars Shell Bodies and Proof Shots IS 14698
4Hot - Rolled Mild Steel Sheet and Strip in Coil Form IS 2385
5Steel Ingots, blooms, and billets for production of mild steel wire for production of mild steel wire rods for general engineering purposes – Specification IS 8952: 1995
6Specification for Cold rolled medium, high carbon and low alloy steel strip for general engineering purposes IS 7226: 1974
7Cold Rolled Non-Oriented Electrical Steel Sheet and Strip –Semi-Processed Type Specification IS 15391:2003
8Steel Pipes For Water And Sewage IS 3589
9Hollow Steel Sections For Structural Use IS 4923
10Steel Tubes For Mechanical And General Engineering Purposes IS 3601
11Steel Tubes For IDLERS For Belt Conveyors IS 9295
12Three-Piece Round Open-Top Metal Cans for Food s and Beverages IS 18427
13Steel Tubes, Tubular, and Other Steel IS 1239 Part-2
14Hot Rolled And Cold Rolled Steel Strips Intended For Processing Of Semi/ Fully Processed Non-Grain Oriented Electrical Steel Or Fully Processed Grain Oriented Electrical Steel IS 18316: 2023
15Hot-Dip Zinc-Aluminium-Magnesium Alloy-Coated Steel Sheets, Plates, And Strips IS 18513: 2023
16Hot-Dip Galvanized/ Galvannealed Steel Sheet And Strips For Automotive Applications IS 18385: 2023
17Hot Rolled Steel Strip, Sheet, and Plates for Welded Steel Pipe for Pipeline Transportation Systems IS 18384: 2023
18Heat Treated Steels Alloy and Free Cutting Steels for Ball and Roller Bearing Steels IS 17111
19Hot Dip Zinc Coating on Structural Steel Bars for Concrete Reinforcement IS 12594
20Galvanized Structural Steel IS 16732
21Braided Nylon Rope for Mountaineering Purposes IS 6590
22Wire Ropes Used in Oil Wells and Oil Well Drilling IS 4521
23STEEL WIRE SUSPENSION ROPES FOR LIFTS, ELEVATORS AND HOISTS IS 2365
24Steel Wire Ropes for General Engineering Purposes IS 2266
25HOT DIP GALVANIZED STAY STRAND IS 2141
26STEEL WIRE ROPES FOR HAULAGE PURPOSES IS 1856
27Stranded Steel Wire Ropes for Winding and Man-Riding Haulages in Mines IS 1855
28Galvanized Steel Barbed Wire for Fencing IS 278
29Silicomanganese IS 1470
30FERROMANGANESE IS 1171
31Ferrochromium IS 1170
32Stainless Steel Seamless Pipes and Tubes for General Services IS 17875
33Stainless Steel Welded Pipes and Tubes for General Service IS 17876
34Malleable Iron Shots and Grits for Use in Foundries IS 9139:1979
35Steel Tubes Used for Water Wells IS 4270
36Steel Tubes, Tubulars and Other Wrought Fittings (Steel Tubes) IS 1239 Part 1
37Steel Tubes for Structural Purposes IS 1161
38Ductile Iron Fittings for Pressure Pipes for Water, Gas and Sewage IS 9523:2000
39Centrifugally Cast (Spun) Ductile Iron Pressure Pipes for Water, Gas and Sewage IS 8329:2000
40Electrogalvanized Hot Rolled and Cold Reduced Carbon Steel, Sheet and Strips IS 17404:2020
41Stress-Relieved Low Relaxation Steel IS 16644:2018
42Stock for Forgings Produced from Continuously Cast Blooms, Billets and Slabs IS 13352:1992
43Thermostat Metal Sheet and Strip IS 5478:1969
44Flame and Induction Hardening Steels IS 3930
45Cold-Reduced Tinmill Products - Blackplate IS 11951:2016
46Carbon and Low Alloy Steel Billets, Blooms, Slabs and Bars for Manufacture of Shell Bodies and Proof Shots Used in Defence Services IS 14986:1999
47Tool Steel Forgings for Metal Forming IS 13387:1992
48Quenched and Tempered Alloy Steel Forgings for Pressure Vessels IS 12145:1987
49Forged / Rolled Ctc Segments IS 8748:1978
50Steels for Die Blocks for Drop Forging IS 5518:1996
51Case Hardening Steels IS 4432:1988
52Carbon and Carbon Manganese Free Cutting Steels IS 4431:1978
53Mould Steels IS 4430:1979
54Structural Steel IS 15911:2010
55Hot-Dip Terne Coated Carbon Steel Sheets IS 12313:1988
56Trapezoidal Steel Wires for Spring Washers IS 12262:1988
57Mild Steel Wire for Cottor Pins IS 10794:1984
58Cold-Reduced and Hot-Rolled Carbon Steel Sheet for Porcelain Enamelling IS 9485:1980
59Hot Rolled Steel Plates, Sheets and Strips for Manufacture of Agricultural Tillage Discs IS 9442:1980
60Steel Wire for Reeds IS 8566:1977
61Heald Wire IS 8565:1977
62Steel Wire for Nipples for Spokes IS 8564:1977
63Half Round Mild Steel Wire for the Manufacture of Split Pins IS 8563:1977
64Tinned Steel Wire for Banding of Armatures and Rotors IS 8510 PART 3
65Tinned Steel Wire for Banding of Armatures and Rotors IS 8510 PART 2
66Steel for Spring Washers IS 4072:1975
67Mild Steel Rivet Bars for Shipbuilding IS 3298:1981
68Hard Drawn Steel Wire for Upholstery Springs IS 2589:1975
69Steel Billets, Bars and Sections for Boilers IS 2100:1970
70Expanded Metal Steel Sheets for General Purposes IS 412:1975
71Cold-Reduced Tinmill Products IS 12591:2018
72Cold-Reduced Tinmill Products - Electrolytic Tin Plate IS 1993:2018
73Steel Wire for Mechanical Springs (Stainless Steel Wire) IS 4454 Part 4
74Chrome Molybdenum Steel Bars and Rods for Aircraft Purposes IS 963:1958
75Soft Magnetic Iron Rods, Bars, Flats and Sections IS 11947:1987
76Soft Magnetic Iron Strips IS 11946:1987
77Carburizing Steel for Use in Bearing Industry IS 5489
78Hard-Drawn Wire Fabric for Concrete IS 1566:1999
7918% Nickel Maraging Steel Bars and Rods IS 14652:1999
80Alloys Used in Electrical Resistance Metallic Heating Elements IS 12045:1987
81Steels for Piston Pins (Gudgeon Pins) IS 11952:1986
82Heat Resistance Steels IS 9516:1980
83Steels for Pneumatic Tools IS 5651:1987
84Steel for Cold Heading/cold Extrusion Applications IS 11169 PART 2
85Non Magnetic Stainless Steels for Electrical Applications IS 10632 PART 3
86Non Magnetic Stainless Steels for Electrical Applications IS 10632 PART 2
87Stainless Steel for Welding Electrode Core IS 10631
88Cold–rolled stainless steel strips for razor blades IS 9294:1979
89Stainless Steel Blooms, Billets and Slabs for Forgings IS 6529:1996
90High Tensile Steel Bars Used in Prestressed Concrete IS 2090:1983
91Low Carbon Steel Wire for Rivets for Use in Bearing Industry IS 4882:1979
92Carbon Steel Cast Billet Ingots Billets, Blooms and Slabs for Re-Rolling Purposes IS 14650:1999
93Low Carbon High Strenth Cold Rolled Steel Sheets and Coilsfor Cold Forming IS 14491
94Steel for High Temperature Bolting Application IS 14331:1995
95Cold Rolled Carbon Steel /Coils for Manufacture of Welded Tubes IS 12367:1988
96Steel Wire for Needles IS 9962:1981
97Cold Rolled Steel Strips for Carbon Steel Razor Blades IS 9476:1980
98Steel Cast Billet Ingots, Billets, and Blooms for Production of High Carbon Steel Wire Rods IS 8951:2001
99Steel Ingots Billets and Blooms for the Production of Springs Rivets and Screws for General Engineering Application IS 8052:2006
100Steel Wire : Uartto 20 Mm for the Manufacture of Cold Forged Rivets IS 7557:1982
101Steel for Electrically Welded Round Link Chains IS 6967:1973
102Steel Wire for Spokes IS 6902
103Carbon-Chromium for the Manufacturer of Balls, Rollers and Bearing Races IS 4398:1994
104Cold Rolled Carbon Steel Strips for Ball and Roller Bearing Cages/ Retainer IS 4397:1999
105Steel Wire for Staples, Pins and Clips IS 4224:1972
106Steel Wire for Umberlla Ribs IS 4223:1975
107Steel for the Manufacturer of Laminated Springs IS 3885 PART 2 : 1992
108Steel for the Manufacturer of Laminated Springs IS 3885 PART 1 : 1992
109Steel for the Manufacture of Volute, Helical and Laminated Springs for Automotive Suspension IS 3431:1982
110Steel for the Manufacture of Volute and Helical Springs (For Railway Rolling Stock) IS 3195:1992
111Mild Steel Wire Rod for the Manufacture of Machine Screws (By Cold Heading Process) IS 2255:1977
112Cold – Rolled Steel Strips for Springs IS 2507:1975
113Carbon Steel Wire for the Manufacture of Wood Screws IS 1812:1982
114Mild Steel Wire, Cold Heading Quality IS 1673:1984
115Steel Rivet Bars (Medium and High Tensile) – for Structural Purposes IS 1148:2009
116Carbon Steel Cast Billet Ingots, Billets, Blooms and Slabs for Re-Rolling into Structural Steel (Ordinary Quality) IS 2831:2012
117Magnetic Materials IS 16585:2016
118Carbon Manganese Steel Forgings for Pressure Vessels IS 12146:1987
119Steel for Valves for Internal Combustion Engines IS 7494:1981
120High Speed Tool Steels IS 7291:1981
121Steel for Hardening and Tempering IS 5517
122Tool and Die Steels IS 3748:2022
123Bright Steel Bars IS 9550:2001
124Structural Steel for Construction of Hulls of Ships IS 3039:1988
125Hot-Rolled Mild Steel Sheet and Strip in Coil Form for Cold-Reduced Tinplate and Cold-Reduced Black Plate IS 2835:1977
126Hot Rolled Steel Strip (Bailing) IS 1029
127Ferronickel IS 4409:1973
128Ferrosilicon IS 1110
129Low Nickel Austenitic Stainless Steel Sheet and Strip for Utensils and Kitchen Applications- Specification IS 15997:2012
130Stainless Steel Plate, Sheet and Strip IS 6911:2017
131Stainless Steel Sheets and Strips for Utensils- Specification IS 5522:2014
132Stainless Steel Bars and Flats IS 6603:2001
133Stainless Steel Wires IS 6528:1995
134Stainless Steel Wire Rod IS 6527:1995
135Structural Steel for Building for Structures with Improved Seismic Resistance IS 15962:2012
136Hot Dip Aluminium- Zinc Alloy Metallic Coated Steel Strip and Sheet (Plain) IS 15961:2012
137High Tensile Strength Flat Rolled Steel Plate (Up to 6 Mm) Sheet and Strip for the Manufacture of Welded Gas Cylinder IS 15914:2011
138Fire Resistant Steel – Specification IS 15103:2002
139Structural Weather Resistant Steel IS 11857:1986
140Steels for Cold Heading/cold Extrusion Application Part-1 Wrought Carbon and Low Alloy Steels IS 11169 Part 1
141Bead Wires for Tyres IS 4824:2006
142Steel Wire for Mechanical Springs Part-2 Oil Hardened and Tempered Steel Wire IS 4454 Part 2
143Steel Wire for Mechanical Springs Part-1 Cold Drawn Unalloyed Steel Wire IS 4454 Part 1
144Alloy Steel Billets, Blooms and Slabs for Forging for General Engineering Purposes IS 4368:1967
145Low Carbon Galvanized Steel Wires Formed Wires and Tapes for Armouring of Cables IS 3975:1999
146Round Steel Wire for Ropes IS 1835:1976
147Mild Steel Wire for General Engineering Purposes IS 280:2006
148Pre-Painted Aluminium Zinc Alloy Metallic Coated Steel Strip and Sheet (Plain) IS 15965:2012
149Pre-Painted Galvanized Steel Sheets and Coils IS 14246:2013
150High Carbon Steel Wire Rods- Specification IS 7904:2018
151Hot Rolled Steel Narrow Width Strip for Welded Tubes and Pipes IS 15647:2006
152Hot Rolled Carbon Steel Strip for Cold Rolling Purposes IS 11513:2017
153Hot Rolled Steel Strip for Welded Tubes and Pipes IS 10748:2004
154Mild Steel Wire Rods for General Engineering Purposes IS 7887:1992
155Hot Rolled Bars for Production of Bright Bars and Machined Parts for Engineering Applications IS 7283:1992
156Hot Rolled Steel Plate (Up to 6 Mm) Sheet and Strip for the Manufacture of Low Pressure Liquefiable Gas Cylinders IS 6240
157Hot Rolled Steel Sheet, Plate and Strip for Forming and Flanging Purposes — Specification IS 5986:2017
158Cold Rolled Steel Strips (Box Strappings) IS 5872:1990
159Steel Chequered Plates IS 3502:2009
160Mild Steel for Metal Arc Welding Electrodes IS 2879:1998
161Carbon Steel Billets, Blooms, Slabs and Bars for Forgings IS 1875:1992
162Hot Rolled Carbon Steel Sheet, Plate and Strip IS 1079 : 2017
163Cold Reduced Carbon Steel Sheets and Strips IS 513 (PART 2)
164Cold Reduced Carbon Steel Sheets and Strips Part 1 Cold Forming and Drawing Purpose Is 513 Part 1:2016
165Mild Steel and Medium Tensile Steel Bars and Hand Drawn Steel Wire for Concrete Reinforcement IS 432 (PART 2)
166Medium Tensile Steel Bars IS 432 Part 1
167Hot Rolled Medium and High Tensile Structural Steel IS 2062:2011
168Oriented Electrical Steel Sheet and Strip- Semi-Processed Type- Specification IS 15931:2003
169Grain Oriented Electrical Steel Sheet & Strip (Crgo) IS 3024:2015
170Cold Rolled Non-Oriented Electrical Steel Sheets and Strip-Fully Processed Type (CRNO) IS 648:2022
171Deformed Steel Bars and Wires for Concrete Reinforcement IS 1786
172Carbon Steel Cast Billet Ingots, Billets, Blooms and Slabs for Rerolling IS 2830:2012
173Steel Plates for Pressure Vessels Used at Moderate and Low Temperature IS 2041:2009
174Steel Plates for Pressure Vessels for Intermediate and High Temperature Service Including Boilers IS 2002:2009
175Galvanized Steel Strips and Sheets (Plain and Corrugated) IS 277:2003
176Uncoated Stress Relieved Low Relaxation Seven-Ply Strand for Pre-Stressed Concrete IS 14268:2022
177Fusion Bonded Epoxy Coated Reinforcing Bars IS 13620:1993
178Uncoated Stress Relieved Strand for Pre-Stressed Concrete IS 6006:2014
179Indented Wire for Pre-Stressed Concrete IS 6003:2010
180Plain Hard-Drawn Steel Wire for Pre-Stressed Concrete Part 2: As Drawn Wire IS 1785 PART 2:1983
181Cold Drawn Stress-Relieved Wire IS 1785 PART 1:1983

Required Documents for Steel Product Certification

The following are the important documents needed for BIS approval for steel goods:

  • Fill out the application.
  • Documents for factory registration (KYC).
  • Flow chart for the manufacturing process.
  • List of necessary testing tools that have been properly calibrated (in-house testing facilities).
  • Details of the raw materials and their certifications of testing.
  • Details of the authorized signatory and QCI.
  • Report on factory testing.
  • Layout of the plant and other relevant documentation.

BIS Certification Process for Steel and Stainless Products

There are two procedures for obtaining a BIS license; let's have a look at both:

1. The Simplified Process

1

A candidate should set up a laboratory of their own for product testing and acquire the relevant Indian Standards.

2

The applicant must submit their application via the BIS portal, along with test results from a lab that BIS has approved.

3

The factory inspection will be carried out by a BIS officer.

4

After being sealed by a BIS inspector during the plant inspection, the sample was delivered to a BIS-approved facility for analysis.

5

Any non-conformance issues brought to light by BIS must be fixed, and instructions must be followed.

6

The ISI certificate is issued by the BIS.

Duration: About 25 to 30 working days following application to the BIS website.
Simplified Procedure Timeline

2. The Normal Procedure

1

Apply the appropriate Indian Standard for the product in question using an internal laboratory.

2

Gather all of your paperwork and submit your application using the BIS site.

3

A BIS officer is to inspect your factory.

4

During a factory inspection, a BIS inspector sealed the sample, which was then delivered to the BIS-approved lab for analysis.

5

Any BIS-reported non-conformities must be fixed, and BIS guidelines must be appropriately implemented in cases where there are non-conformity issues.

6

After a product satisfies all of these testing requirements, BIS will issue the ISI certificate.

Duration: About 60 to 90 working days after applying via the BIS portal.

BIS Certification Cost for Steel Products

Below is a detailed breakdown of the costs associated with ISI certification for Indian Standards:

S.No. Particular Amount (INR) Remarks
1 Application Fee 1000 To be paid directly to BIS
2 Audit Fee 7000 To be paid directly to BIS
3 License Fee 1000 To be paid directly to BIS
4 Sample Testing Fee As Applicable To be paid directly to BIS Testing charges vary from product to product and lab to lab.
5 Minimum Advance Marking Fee As per actual To be paid directly to BIS (Marking fee vary as per Indian standards.)
6 Renewal Fee 1000 To be paid directly to BIS
7 Inclusion Fee 5000 To be paid directly to BIS
8 ERCS Service Fee Please Contact info@elitasrcs.com

Benefits of BIS Certification for Steel in India

The primary advantages of obtaining BIS licensing are as follows:

1. Certification: Customers and regulatory bodies receive quality certification confirming structural quality and stringent testing.
2. Increased Market Acceptance: ISI certified items are preferred, especially in government tenders for major construction projects.
3. Conventional Rules Followed: Ensures the company won't be fined or run afoul of the law for subpar materials.
4. Competitive Advantage: The ISI mark serves as a national symbol of quality, helping businesses win more customers.
5. Customer Confidence: Increases brand awareness and fosters greater loyalty as consumers associate ISI with safety.
6. Responsibility and Risk: Lowers the chance of structural collapse, easing liability concerns for manufacturers and end users.

Why Choose ERCS Pvt Ltd for Steel Product Quality Certification

To register with BIS and produce a standard-quality product, the manufacturer must make sure that their product meets certain Indian Standard Specifications (ISS), which we directly convey from BIS authorities following the Indian Standards. ERCS Private Limited will be a true advisor and mentor during the process of getting product certifications from the appropriate authorities and departments. Moreover, ERCS Pvt. Ltd. has built a broad network within the steel industry and multiple BIS departments to help with BIS certification of steel products.

Frequently Asked Questions (FAQs)

BIS accepts applications for product certification in online mode only. Please contact us for any type of assistance for obtaining the BIS Certificate.

Separate applications for each product / ISS are required to be submitted even for the same factory / Manufacturing location.

Separate applications for each product / ISS are required to be submitted even for the same factory unit at different locations.

The test report must be from a BIS-recognized laboratory that certifies conformity with the relevant Indian Standards (IS).

The test report will be valid up to 90 days from the date of issue of the test report.

After the grant of licence to the manufacturer, BIS can do surprise factory surveillance inspections through visits to the factory by certification officers of BIS or by personnel of the Agents appointed by BIS as per Rule 33 of BIS Rules, 2018. BIS will verify that the manufacturer continues to maintain the manufacturing infrastructure, process controls, quality control, and testing formalities, and conformity of the product to the applicable Indian Standard. Testing of the product samples in the factory is also witnessed during the inspection. A sample of the ISI-marked product is also drawn from the factory for verification through third-party laboratory testing. BIS also carries out market surveillance through the purchase of samples for testing.

A BIS licensee is required to inform BIS that they are shifting the factory location to a new address with relevant documents for the new premises similar to the documents submitted at the time of applying to BIS for the grant of a licence. The licensee can suspend the use of the Standard Mark under intimation to the Bureau upon relocation. The revocation of suspension may be done by the Bureau after verification of the old premises and verification of the production process at the new premises as per the provision of paragraph 11 (3) & (4) of scheme I of BIS (Conformity Assessment) Regulations, 2018.

Accelerate Your Market Entry.

Don't let regulatory bottlenecks delay your product launch. Connect with our compliance experts to map out your testing timeline and documentation requirements.

Trusted by global industry leaders
adla logo
cms logo
egger logo
elkem logo
hensel logo
hettich logo
vale logo
vedanta logo
wieland logo
Need Compliance Help?

Fill out the form below and one of our regulatory experts will contact you shortly.