“Licence is granted to use Standard Mark on Electric Ceiling Fans as per IS 374:2019”. | |
---|---|
Types / Scope of license | Electric ceiling type fans, driven by squirrel cage induction motor (capacitor type) / Brushless dc motor fans, with or without Speed Regulators / Remote Control Device, for fan size(s) ……mm, .…V, 50 Hz, Insulation Class … Rating Input Wattage … Model No…. |
For Indian Manufacturers | ||||
---|---|---|---|---|
No. | Major Charges | Amount | Remark | |
1. | BIS Fee | Application Fees | INR 1000 | To be paid in BIS A/c directly. 20% rebate on Marking Fee for MSME units. |
Audit Charges | INR 7000 | |||
License Fee | INR 1000 | |||
Marking Fee | INR 65,000 | |||
2. | Testing Charges | Sample Test Fee | As Applicable | To be paid into BIS approved Lab A/c |
3. | ERCS Service Fee | Consultancy & others | As per actual, (Depending upon the product and the region of factory) |
For the Foreign Manufacturers | ||||
---|---|---|---|---|
No. | Major Charges | Particulars | Amount | Remark |
1. | BIS Fee | Application Fees | USD 30 | To be paid into BIS A/c directly in USD (SWIFT). SAARC countries can pay in INR with GST@18% |
Audit Charges (consolidated) | USD 3200 to USD 5900 | |||
License Fee | USD 30 | |||
Marking Fee | USD 800 | |||
2. | Testing Charges | Sample Test Fee | As Applicable | To be paid into BIS approved Lab A/c |
3. | ERCS Service Fee | Consultancy & others | As per actual, (Depending upon the product and the region of factory) |
ERCS Pvt. Ltd. has developed a vast network within the Plastic Industry & various BIS departments to assist for ensuring conformity of the product Polypropylene (PP) Materials for Moulding and Extrusion according to according to IS 374.
In order to facilitate the manufacturing industry in obtaining BIS certifications, guidelines have been developed. Our team has the experience of completing over 150 projects and technically competent acquaintances in various Industries.
We are familiar with the Indian Standard Specifications & BIS guidelines and deliver the most suitable interpretation to the Quality Control Personnel so we can do a reliable and effective documentation of your product in accordance with the BIS guidelines.
In the process of getting BIS certification, the officer from BIS authority visits the factory for inspection. In order to get good results, the BIS inspection should go smoothly without any Non-Conformity. By keeping this goal in mind, our team will organize a pre-visit to your factory premises so that required changes can be adapted so as to remove the elements of fallibility.
We will explain the whole procedure of conducting a BIS inspection and make you aware of the things which need to be prepared and readily available at the time of inspection.
(0)
Login To Leave Review