Free Consultation
info@elitasrcs.com | ➀ +91-9076611766 ➁ +91-9076611767
Mandatory

BEE Registration for
Grid-Connected Solar Inverter

IS 17980:2022/ IEC 62891:2020

BEE Registration for grid-connected solar inverters up to 100 kW capacity is officially mandatory in India under the Bureau of Energy Efficiency (BEE) Standards and Labelling (S&L) program. This regulatory framework operates under IS 17980:2022 / IEC 62891:2020, which establishes rigorous performance testing and efficiency benchmarks. Compliance is legally required for all single-phase (230 V AC) and three-phase (up to 415 V AC) non-storage grid-tied inverters sold or imported into the Indian market.

To ensure optimal performance and energy efficiency, obtaining BEE Certification for Grid-Connected Solar Inverters has become increasingly important under India’s regulatory framework. Due to rising energy demand and the shift towards renewables in India. This is in accordance with the Appliance Labelling and Compliance Regulations, 2026, which came into effect on 1st January 2026.

Key Highlights of the IS 17980:2022/ IEC 62891:2020 for Grid-Connected Solar Inverter

Particulars

Details

Product Name

Grid-Connected Solar Inverter

Applicable Certification

BEE Star Label or BEE Registration

Applicable Indian Standard

IS 17980:2022/ IEC 62891:2020

Compliance Requirement

Compliance with the applicable BEE energy-efficiency requirements and testing under the prescribed standards. BIS compliance/certification is also required for eligibility under the BEE programme.

Regulatory Authority

Bureau of Energy Efficiency (BEE)

Administrative Ministry

Ministry of Power, Government of India

Purpose of Registration

To assess and promote the energy efficiency and overall performance of grid-connected solar inverters and help consumers identify efficient products.

Testing Requirements for BEE Certification for Grid-Connected Solar Inverter

Testing must be performed at a National Accreditation Board for Testing and Calibration Laboratories (NABL)-accredited or BEE-approved laboratory to verify minimum efficiency performance standards (MEPS) in accordance with IS 17980:2022 / IEC 62891:2020. A valid Bureau of Indian Standards (BIS) safety certification under IS 16221-2:2015 is a strict prerequisite before applying for BEE registration.

  • Conversion Efficiency Testing: Measures how efficiently the inverter converts DC power from the solar PV system into AC power.
  • Static MPPT Efficiency: Evaluates how effectively the inverter tracks the maximum power point under defined steady-state operating conditions.
  • Dynamic MPPT Efficiency: Assesses the inverter's ability to track changes in PV input and maintain efficient operation under varying conditions.
  • Multiple MPPT Input Testing: Where an inverter has multiple independent MPPT inputs, the applicable measurements are performed for the intended input configurations.
  • PV Simulator Testing: The required PV I/V characteristics are simulated during the measurement procedure to evaluate inverter performance under specified operating conditions.
  • Grid Voltage Conditions: Testing is performed at the specified nominal grid voltage; any deviations are documented in the test report.

Step-by-Step BEE Star Rating Process for Grid-Connected Solar Inverter 

Both the producer and the importer must undergo a registration procedure to obtain the BEE Star Rating for Grid-Connected Solar Inverters.

  • Product Verification: Ensure your product is eligible for Compulsory or Voluntary BEE Certification.
  • Product Sampling: Send samples of your product to NABL-accredited laboratories.
  • Product Testing: Your product shall be tested in the laboratory for performance (star rating) and safety (BIS).
  • Document Collection: Collect all required documents, including the factory license, user manual, BIS license, and the manufacturing unit address.
  • Brand/Company Registration: Your company/brand gets registered on the BEE website, and payment is made.
  • Application Filing: The application will be filed online and offline, along with signatures on the documents.
  • Document Evaluation: BEE officials will evaluate your application to ensure all submitted documents are in order.
  • BEE Certification: Once all the requirements in the documents and application are fulfilled, BEE officials give you a BEE certificate.

Documents for a BEE Certificate for Grid-Connected Solar Inverter

The following are documents that have to be prepared before filling in the application form:

Documents to be provided by the Company/Business

  • Filled-in BEE Application Form
  • Proof of Factory/Mfg. Plant address
  • Manufacturer/Import Identification
  • Registration Certificate of Firm
  • Signature Authority details
  • Trademark & ISO Certification (wherever applicable)
  • Fees Payment Acknowledgement

Documents to be provided by Product & Technical

  • Filled-in Product Specification Sheet
  • Technical specifications
  • Usage and safety instruction manual
  • NABL Test report as per IS 17980:2022/ IEC 62891:2020

For Foreign Manufacturers

  • Letter of appointment of Authorised Indian Representative (AIR)
  • Brand authorisation letter (if any)

BEE Registration Timeline, Validity & Renewal for Grid-Connected Solar Inverter

The BEE Registration process usually takes between 30 and 60 days (6 to 8 weeks total, including laboratory testing). International producers should send their application via an Authorised Indian Representative (AIR) or an Indian importer. The certificate will be issued for 3 years or for the validity period of the notification for the particular product.

Procedure for BEE Registration Renewal

Advance Notice: BEE provides an advance notice or renewal window a few months prior to the expiry date. 
Re-testing: Products need to be retested if any changes were made to the efficiency parameters in a certified lab accredited by NABL or approved by BEE.

  • Online Application Submission: Access the BEE Portal for the renewal application submission. 
  • Documentation and Fees: Provide updated technical documentation, production details, a new sample label design, and pay the required government processing fees. 
  • Renewal: Upon verification, BEE reissues the certificate, granting permission to continue using the label.

Why Choose ERCS Private Limited for BEE Registration for a Grid-Connected Solar Inverter?

ERCS Private Limited, for BEE registration of Grid-Connected Solar Inverters, provides comprehensive services, from assessing and coordinating product testing to filing applications and securing approval. ERCs ensure that the product satisfies the appropriate requirements set by the Bureau of Energy Efficiency (BEE) and complies with standards such as IS 17980:2022 / IEC 62891:2020.

  • Knowledge of Regulatory Requirements: Comprehensive knowledge of Indian standards such as IS 17980:2022/IEC 62891:2020 and the changing star-labelling system of the BEE. 
  • One-stop Service: Takes care of everything, right from sample testing coordination at recognised test laboratories to documentation and application filing. 
  • Market Efficiency: Eliminates issues encountered during import, customs clearance, or application scrutiny. 
  • Testing and Laboratory Integration: ERCS controls the stringent process of product testing and analysis.

FAQs

Q1. What is the BEE Registration for Grid-Connected Solar Inverters? 
Ans. BEE Registration is a certificate verifying that the eligible solar inverter complies with the prescribed energy-efficiency standards of the Standards & Labelling program.

Q2. What is the applicable standard for Grid-Connected Solar Inverters under BEE? 
Ans. The standard for grid-connected solar inverters under BEE is IS 17980:2022/ IEC 62891:2020.

Q3. Is BIS Certification Mandatory before BEE Participation? 
Ans. Yes, it is mandatory to comply with the BIS safety requirements before registering for BEE.

Q4. What efficiency is tested for the solar inverter? 
Ans. Usually, both the MPPT Efficiency and the steady-state conversion efficiency of the solar inverter are tested.

Need Compliance Help?

Fill out the form below and one of our regulatory experts will contact you shortly.

Expo Event